Project information

  • Category: Water Supply & Sanitaion
  • Client: Co-Financing Water Supply and Sanitation Project, Department of Water Supply and Sewerage Management
  • Project Start Date: June, 2020
  • Project End Date: February, 2021
  • Scope of Services: Detailed Survey, Design, Cost Estimate and Report Preparation of Co-financing Water Supply and Sanitation Project: Neelkantha-2,3,4&12, Tripurasundari-1&2 in Dhading District; and Sundar Bazar-2,5,6,7&9 in Lamjung District

Project Description

Project a Neelkantha Municipality, Ward No. 2,3,4 &12, Dhading district. Project Features: Base year (2022) population: 24,391, No. of Households: 5,215, Project Region: Hilly (Urban), Total distance (Transmission and Distribution Pipe) - 80.96 Kms, Gravity schemes, RCC Reservoir Tanks-6 Nos. (125, 150, 4200) m3, Design Discharge: 62.25 lps, Water Treatment System with 26 lps: Plain Sedimentation Tank (PST): 2 Nos. Slow Sand Filter (SSF): 2 Nos. Sand Wash Platform (SWP): 2 Nos. Chlorination Units: 8 Nos

Project at Tripurasundari Rural Municipality, Ward No. 1 &2, Dhading district. Project Features: Base year (2022) population: 13,650, No. of Households: 2,730, Project Region: Hilly (Sub-Urban), Total distance (Transmission and Distribution Pipe) - 62.17 Kms, Gravity schemes, RCC Reservoir Tanks-2 Nos. (2400) m3, Design discharge: 39 lps, Water Treatment System of 42 lps: Plain Sedimentation Tank (PST): 1No. Slow Sand Filter (SSF): 1 No. Sand Wash Platform (SWP): 1 No. Chlorination Units: 1 Nos

Project at Sundarbazar Municipality, Ward No. 2,5,6,7 &9, Lamjung district. Project Features: Base year (2022) population: 16,451, No. of Households: 3,502, Project Region: Hilly (Urban), Total distance (Transmission and Distribution Pipe) - 124.24 Kms, Gravity and Pumping Schemes, RCC Reservoir Tanks-5 Nos. (2100, 3150) m3, Design discharge: 39 lps, Water Treatment System of 42 lps: Sumpwell: 2 Nos. Plain Sedimentation Tank (PST): 2 Nos. Slow Sand Filter (SSF): 1 No., Sand Wash Platform (SWP): 1 No., Chlorination Units: 4 Nos.

Services

  • Identified existing situation of water supply and sanitation of the project area,
  • Identified water supply and sanitation structures in terms of their reuse in case of rehabilitation of existing systems,
  • Carried out detailed engineering and socio-economic survey of the project area prepared detail design and cost-estimate of the project, Detailed design of Treatment Plant.
  • Verified the source yield, water quality, intake/ deep well boring site, reservoir site, pipe alignment and number of locations of public taps ad other major structures,
  • Carried out geotechnical investigation, ground water investigation and water testing,
  • DRP of office building and guard house,
  • Prepared tender/bid documents.