The main task of the consulting service is to conduct the Detail Engineering Design of all the components of the Sisneri Water Supply System including Detail Drawing, Cost Estimate and preparation of Procurement Documents Works. The consultant also shall prepare the scoping document and Terms of Reference (ToR) for the Environmental Impact Assessment (EIA) of Sisneri Water Supply Project and (ii) Preparation of Detailed TOR for Design of the Sisneri Dam. The Consultant shall follow National/International best practice during survey, design, and report preparation in close coordination with KVWSMB. Total project Cost: NPR 33,077,714,105