Our Projects

Project information

  • Category: Road, Bridge & Transport Infrastructure
  • Client: Rural Access Programme-3; DFID-UK assistance
  • Project Start Date: February, 2014
  • Project End Date: February, 2015
  • Scope of Services: Parbat, Sindhupalchowk, Dailekh and Jumla Districts

Project Description

Detailed Engineering Survey,Design and initial Environment Examination (IEE) for Road Improvement Projects In Parbat, Sindhupalchowk, Dailekh and Jumla Districts :

  • Silmi- Thulipokhari – Karkineta (13.430 Km)
  • Chisapani – Huwa – Wahakibhanjyang – Barrachaur lokmarga (6.830 Km)
  • Chautara – Sipaghat (26.100 Km)
  • Shreesthan – Navisthan – Gaumadi (7.960 Km)
  • Dailekh – Naumule (15.620 Km)
  • Acharyali – Narakot (2.340 Km)
  • Gachchusanghu – Dhimichaur – Lekpor- Kotghar (9.700 Km)
  • Bagbazar – Patharkhola (3.230 Km)

Services

  • Review existing reports, standards and specification of the road sector related to assignment
  • Consultation with concerned Road Office, Geo Environmental and social Unit, Regional Directorates and other concerned offices for information and data collection. Prepare the topographical map of the corridor
  • Detailed engineering survey of the alignment and its corridor
  • Conduct hydrological studies for cross drainage works and purpose the suitable cross drainage structures
  • Carry out traffic surveys and project the traffic volume for 20 years’ period
  • Carried out detail engineering design of road using computer Aided Design (CAD) Software.
  • Prepare practical and cost effective geometric (horizontal, vertical, intersection etc.), pavement and structural designs on the basis of projected traffic level.
  • Wherever required on technical ground, recommend for improvement on alignment
  • Prepare working drawings in AutoCAD.
  • Prepare cost estimates with analysis of rates
  • Prepare Detail survey and design reports with necessary drawings.