ENVIRONMENTAL STUDY AND BIO-ENGINEERING
 1.      IEE with DRI lead SIDeF, Sati- Bhajami – Dhanghadi; Hulaki Roads Upgrading Works (61 km), Client : GESU DOR, Completed : June 2009.

 

2.      IEE with DRI lead SIDeF, Lamki – Tikapur _ Khakraula link Road Upgrading  Works (27 km), Client : GESU DOR, Completed : June 2009.

 

\

3.      Initial Environmental Examination (IEE) of Diktel – Chyandanda District Road (48 km), Khotang under RAP in 2003. 

 

4.      Environmental Assessment  of  Pharping - Kulekhani Road (22 km), Makwanpur district under Plan International in 1995

 

5.      Environmental Assessment of Benighat – Arughat - Arkhet Road (54 km), Gorkha under RDP/GTZ in 2000.

 

6.      Initial Environmental Examination  (IEE) of Water Supply Project of Tulsipur Municipality, Dang under Small Town Water Supply and Sanitation Project, DWSS/ADB, EEC/SIDeF JV in 2003.

 

7.      Initial Environmental Examination  (IEE) of Water Supply Project of Tribhuwan Nagar (Ghorahi), Dang under Small Town Water Supply and Sanitation Project, DWSS/ADB, EEC/SIDeF JV in 2003.

 

8.      Preparation of Environmental Management Action Plan (EMAP) of Jumal – Kalikot Section (36 km) of Karnali Highway under RMDP/DoR in 2004

 

7.     Annual bioengineering works and roadside plantation works for soil stabilization in the two roads (65 km.) under DDP/GTZ from 1994 - 1998.

 

8.     Stabilization of landslides at various places in the Dhading roads with bioengineering measures; seven major landslides had been stabilized from 1994 - 1998

 

9.     Action research on low-cost bioengineering structures in DDP; some of them were:

a)   Earth-filled vegetated gabion structures.

b)   Earth-filled vegetated jute bag walls.

c)   Slope stabilization with live tree stumps.

d)   Use of local species for soil stabilization.

e)      Use of vegetated bamboo terracing for slope stabilization.

 

10.   Design of Landslide stabilization works at Phulchoki Pakhero of Godamchaur VDC, Kathmandu in 1994.

 

1.       Slope stabilization works at Goldhunga VDC, Kathmandu in Osho, Tapoban in 1995.

 

2.         Design and supervision of slope stabilization works and design for improvement of existing alignment of Pharping - Humane Bhanjyang Road section supported by PLAN International in 1996.

 

Involved in the Impact Evaluation of bioengineering training programme including the assessment of application of training skill for DoR/Geo-Environment Unit supported by DFID in 199